MONDEWAY DRAIN®
Shower drain base PVC and ABS for vertical drain connection
Company Information
We mainly engaged in designing, manufacturing and sales of new deodorant drain, stainless steel shower channel, triangle drain and square drain, used in the shower room. Our new deodorant drains are novel in appearance, easy to change and clean, and never rusty in whole life.
Located in Jishigang Ningbo which near to the airport and with a workshop area of 3000 square meters and 40 staffs, our factory has passed the ISO9001:2000 international quality system certification in 2009. We also had applied many patents for most of our new models of shower drains and some are certified by CE.
Originated from European design idea, combined with our own R&D, our shower drains are very competitive in design, quality and price. We strictly made the parts under the requirement of ISO Quality Management System, from raw materials procurement, parts stamping, bending, welding to complete assembly. Every step, we will follow inspection procedures. Before packing, we are also doing 100% welding leakage test as customer requirement, in case any customer leakage complain after installation, causing irreparable damage to the customer.
Our factory:
Why better to choose us…
1. More than 5 years experience on producing STAINLESS STEEL linear shower drain.
2. 100% tested in factory and assure raw materials are SS304,order with SS316 is acceptable.
3. Professional R&D group to offer OEM&ODM service.
4. Professional Sales Team to offer best service to customers, make your business easy.
5. Organized and specialized manufacturer to produce high quality of drains.
6. Our concept of cooperation is service first, customer always foremost, no best service from us, but always better than before.
7. We are looking forward to the long-term business relationships with customers.
8. We got patents in China to protect our right.
9. We got CE certificate from Intertek with standard EN1253-1:2015.
10. We promise 15 years quality warranty on SS part.
11. We do leaking test for all of our drains and assure all of them are perfect on welding.
12. We never stop improving on our design and developing new items, you can get newest design and samples from us and don’t need to pay for anything.
13. We are looking for AA cooperation, we are your A supplier and you are our A customer.
14. Fast delivery date, large quantity in stock, sample orders will be in 1 to 3 days, and normal orders will be in 1 to 5 weeks.
15. All the material of plastic accessories is environmental.
CE Certification,Test report&patents
We accept payment by
FREIGHT COLLECT
Our teams are always here for you!
Let's start long-term cooperation here.
FAQ
Brand Name: |
Mondeway |
Price: |
Based on RMB/USD FOB Ningbo. |
Payment terms: |
30% TT deposit, 70% balance against copy of BL or before shipment. |
Delivery date: |
1 to 5 weeks depends on order quantity. |
Raw material: |
SS304(SS316 is acceptable) |
Packing details: |
Polybag inside and white carton box with wooden pallet outside. |
1) How can I place order?
A: You can contact us by email about your order details, or place order on line.
2) How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T and Paypal, Western Union are the most usual ways we are using.
3) What's the order procedure?
A: First we discuss order details, production details by email or TM. Then we issue you an PI for your confirmation. You will be requested to do pre-paid full payment or 30% deposit before we go into production. After we get the deposit, we start to process the order. We usually need 1-5 weeks if we don't have the items in stock. Before production has been finished, we will contact you for shipment details, start to prepare the shipment for you, and the balance payment should be settled at the sight of copy of BL.
4)How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.
5)How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure. And all the goods will be tested after welding, assure 100% no leaking problems.