Hot search keywords :
Relx Pod Relx Relx Device Candle Holder
Qinyang Tengyao Special Steel Tube Manufacturing Favorite Shop Store Rating:
Home  /   Machinery /   Machinery /   Paper Production Machinery

Paper machinery parts Paper machine frame

Price Per Unit: $1500
Suppling Ability: 9999 Ton
Quantity:
Delivery Time: 8 to 10 days
Payment Type: L/C, T/T, Others
Product Group: Paper Production Machinery
Qinyang Tengyao Special Steel Tube Manufacturing
Achasoda 5 year store
  • Quotation

    5↑

  • Service

    5↑

  • Logistics

    5↑

Province/State:

City:

District:

LIVE CHAT
MESSAGE SELLER
For Best Rates
ORDER NOW
Hot sale window
Overview
Quick Details
Place of Origin:
China
Condition:
New
Warranty:
Unavailable
Applicable Industries:
Manufacturing Plant, Construction works 
Product name:
Paper machine frame
Material:
Q235B Q345B
Support:
Custom
Supply Ability
Supply Ability:
100 Ton/Tons per Month
Packaging & Delivery
Packaging Details
Standard Seaworthy Packaging.
1, First layer, film wrapped
2, Second layer, Paper interleaved
3, Third layer, Corrugated Paper
4, Outside Plastic Package
5, Side with steel protection circles.
Port
Tianjin port Qingdao port
Picture Example:
package-img
Lead Time :
Quantity(Tons) 1 - 100 >100
Est. Time(days) 20 To be negotiated
Product Description
Paper machinery parts Paper machine frame
Related Products
Packing&Shipping
Standard Seaworthy Packaging.  1, First layer, film wrapped  2, Second layer, Paper interleaved  3, Third layer, Corrugated Paper  4, Outside Plastic Package  5, Side with steel protection circles.
Company Introduction
Shenzhen onetouch trading company  is a wholesale company that manufactures good & high quality knitting wear and woven wear, starting from 2006. The company provides the customized products and OEM service. Various new collections and design are coming out each month with the current styles and fabrics. The factory own the proficient skill and updated machine
FAQ
1: Do you have OEM service? A: yes, the specifications and models of the products can be customized according to your needs. 2: are you a trading company or a manufacturer? A: we are a company integrating industry and trade. 3: how long is your delivery time? A: generally speaking, it takes 15-20 days after receiving the advance payment. The exact delivery time depends on the item and quantity of your order. 4: where is your factory? May I see the work? A: Changfu road, qinyang city, henan province

Product consult

Due to the difference in the purchase situation and question time of each consultant, the following responses are only valid for the questioner within 3 days, other netizens are for reference only ~

I want to consult
Hot sale window
Product category
Shops sell well
Qinyang Tengyao Special Steel Tube Manufacturing BY Achasoda Shop
2016 © SiCheng B6 V2.0 Enterprise Loading time:0.24s