$14.5
Rose Gold Plated Stainless Steel Jewelry Set
Quick Details:
Jewelry Type |
Jewelry Sets |
Place of Origin |
Guangdong, China |
Brand Name |
Rainso |
Model Number |
OSS |
Jewelry Sets Type |
Necklace, ring and earring set |
Jewelry Main Material |
Stainless Steel |
Main Stone |
Zircon or Crystal |
Occasion |
Anniversary, Engagement, Gift, Party, Wedding |
Gender |
Men's, Women's |
Material |
Stainless Steel |
Stone material |
Marcasite |
Class |
High |
Process |
Plated and grinding |
MOQ |
100PCS |
Sample |
Supply |
Mass Production Delivery |
40-50days |
Necklace Size |
50cm |
Ring Size |
52-64# |
Bangle |
As sample |
Packaging & Delivery:
Supply Ability:
50000 Piece/Pieces per Month
Packaging Details
1>.Electrostatic film and PP bag package: 1pc/pp bag
2>.Following your special instructions of package.
Port
Guangzhou
Product Description:
Quality Standard | All Products with EU Standard Certificate |
Sample | Supply for you to check quality |
Packing | Opp bag, with protection bubble films in carton |
Price Terms | EXW Guangzhou |
Payment Terms | 30% Deposit in advance,70% Balance Before Shipping |
Payment Way | T/T, Paypal, Trade Assurance |
Delivery Time | Within 1 day by stock, 30-40days by mass production |
Shipping Way | Fast way by air because of small volume |
Product Details
FAQ:
1. You are a trading company or factory? Where is your factory?
We are a factory.
Factory located in Dongguan, Guangdong Province, China.
2. What's your payment terms?
30% deposit in advance, 70% balance before shipment.
Payment way like T/T, Credit card, Western Union, Paypal, Trade Assurance.
3. What`s MOQ?
If in stock, 5pcs per style; if not, Usually 200pcs.
4. How much for a mould?
About 100USD, and it is up to the material, design etc.
please feel free to consult us for more details.
5. How long for sampling?
Usually, if the required sample is in our range and stock is available, the sample will be available within1-3days; and production sample will take 7-15days to be ready.
6. Why the delivery time 45 days, so long?
Delivery time is counted from the date the order is confirming. Mould making 10days, Material preparation about 3 to 5 days, punching 5 days, drilling 3 days, assembling 3 days, polishing 3 days, cleaning and sandblasting 3 days, plating 5-7 days, Epoxy 3 days, QC 1-2 days etc. Then you can count the days by yourselves.
7. Could I put my own logo on products? Should l pay extra?
Yes, the logo can be customized.
If mass production, logo laser for free; if for stock items, a little handling charges needed.
8. Do you do dropshipping?
Yes, we would be glad to help.
Due to the difference in the purchase situation and question time of each consultant, the following responses are only valid for the questioner within 3 days, other netizens are for reference only ~
I want to consult